Tenaga
Nasional Berhad (TNB) is the main electricity power generator and supplier
in Selangor.
|
| |
|
|
| |
|
| Commercial
Tariffs - for offices, shops and hotels |
per
kWh
|
|
(sen)
|
(UScents)
|
| Tariff
B (Low Voltage) |
| For
overall monthly consumption between 0 - 200 kWh per month |
| For
all kWh |
| The
minimum monthly charge is RM7.20 (US$2.17) |
| For
overall monthly consumption more than 200 kWh per month: |
| For
all kWh (from 1kWh and above) |
| The
minimum monthly charge is RM7.20 (US$2.17) |
|
|
|
| Tariff
C1 (Medium Voltage) |
| For
all kWh |
For
each kW of maximum demand per month:
RM24.60 (US$7.42) |
| The
minimum monthly charge is RM600.00 (US$181.05) |
| |
|
|
|
| Tariff
C2 (Medium Voltage Peak/Off-Peak) |
|
For all kWh during the peak period (0800 - 2200 hours) |
| For
all kWh during the off-peak period (2200 - 0800 hours) |
| For
each kW of maximum demand per month during peak period:
RM36.60 (US$11.04) |
| The
minimum monthly charge is RM600.00 (US$181.05) |
| |
|
|
|
|
| |
|
|
| |
|
| Industrial
Tariffs - for factories |
per
kWh
|
|
(sen)
|
(UScents)
|
| Tariff
D (Low Voltage) |
| For
overall monthly consumption between 0 - 200 kWh per month: |
| For
all kWh |
| The
minimum monthly charge is RM7.20 (US$2.17) |
| For
all kWh (from 1kWh and above) |
| The
minimum monthly charge is RM7.20 (US$2.17) |
|
|
|
| Tariff
E1 (Medium Voltage) |
| For
all kWh |
| For
each kW of maximum demand per month: RM24.60 (US$7.42) |
| The
minimum monthly charge is RM600.00 (US$181.05) |
|
|
|
| Tariff
E2 (Medium Voltage Peak/Off-Peak) |
| For
all kWh during the peak period (0800 - 2200 hours) |
| For
all kWh during the off-peak period (2200 - 0800 hours) |
| For
each kW of maximum demand per month during peak period:
RM30.80 (US$9.29) |
| The
minimum monthly charge is RM600.00 (US$181.05) |
| |
|
|
|
| Tariff
E3 (High Voltage Peak/Off-Peak) |
| For
all kWh during the peak period (0800 - 2200 hours) |
| For
all kWh during the off-peak period (2200 - 0800 hours) |
| For
each kW of maximum demand per month during peak period:
RM29.60 (US$8.93) |
| The
minimum monthly charge is RM600.00 (US$181.05) |
| |
|
|
|
|
| |
|
Note
: For industrial customers, whose total electricity cost is more than 5%
of the total cost of their industry are eligible for a Special Industrial
Tariff which is 10% to 15% lower than the normal industrial tariff. |
| |
|
Source
: Tenaga Nasional Berhad |
| |
|
|
| |
|
|
| |
|
|
| |
|
|
|
per
m³
|
|
RM
|
US$
|
| |
Selangor
/ Federal Territory of Kuala Lumpur & Putrajaya
Industrial/Commercial |
| 0
- 35 m³ |
| More
than 35 m³ |
|
Minimum charges
|
|
|
|
|
| |
|
|
| |
|
Source:
Ministry of Energy, Water
& Communications |
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
Sewerage
services in Malaysia were privatised in 1994 and are managed by Indah Water
Konsortium Sdn. Bhd. which operates in 86 Local Authorities areas except
those in Johor Bahru, Kelantan, Sabah and Sarawak. |
| |
|
|
| |
|
Domestic
Customers |
| |
|
|
| |
|
|
Domestic
Customer
|
Per
month
|
|
RM
|
US$
|
| Houses
receiving connected sewerage services |
8.00
|
2.41
|
| Houses
with individual septic tanks |
6.00
|
1.81
|
| Village/estate
dwelling houses with individual septic tanks or receiving connected
sewerage services |
3.00
|
0.91
|
Low
cost dwelling houses and houses with Annual Value of less than RM600
(US$181.05) with individual septic tanks
or receiving connected sewerage services |
2.00
|
0.60
|
|
| |
|
|
| |
|
Industrial
Customers |
| |
|
|
| |
|
| Industrial
Customers |
Per
head per month
|
|
RM
|
US$
|
Premises
receiving connected sewerage services
|
2.50
|
0.75
|
Premises
with individual septic tanks
|
2.00
|
0.60
|
|
| |
|
|
| |
|
Commercial
Customer |
| |
|
|
| |
|
|
Annual
Value of Property
|
Monthly
charge for
premises receiving connected
sewerage services
|
Monthly
charge
for premises with
individual septic tanks
|
|
RM
|
US$
|
RM
|
US$
|
RM
|
US$
|
|
2,000
or less
|
604
or less
|
8
|
2.41
|
7
|
2.11
|
|
2,001
- 5,000
|
604
- 1,509
|
14
|
4.22
|
8
|
2.41
|
|
5,001
- 10,000
|
1,509
- 3,018
|
20
|
6.04
|
14
|
|
|
10,001
- 20,000
|
3,018
- 6,035
|
26
|
7.85
|
19
|
5.73
|
|
20,001
- 30,000
|
6,035
- 9,053
|
29
|
8.75
|
21
|
6.34
|
|
30,001
- 40,000
|
9,053
- 12,070
|
32
|
9.66
|
23
|
6.94
|
|
40,001
- 50,000
|
12,070
- 15,088
|
35
|
10.56
|
25
|
7.54
|
|
50,001
- 60,000
|
15,088
- 18,105
|
38
|
11.47
|
27
|
8.15
|
|
60,001
- 70,000
|
18,105
- 21,123
|
41
|
12.37
|
29
|
8.75
|
|
70,001-80,000
|
21,123
- 24,140
|
44
|
12.28
|
31
|
9.35
|
|
80,001-90,000
|
24,140
- 27,158
|
47
|
14.18
|
33
|
9.96
|
|
90,001-100,000
|
27,158
- 30,175
|
50
|
15,09
|
35
|
10.56
|
|
100,001-200,000
|
30,175
- 60,350
|
180
|
54.32
|
120
|
36.21
|
|
200,001-400,000
|
60,350
- 120,700
|
495
|
149.37
|
330
|
99.58
|
|
400,001-600,000
|
120,700
- 181,050
|
522
|
157.51
|
348
|
105
|
|
600,001-800,000
|
181,050
- 241,400
|
1,980
|
579.47
|
1,320
|
398.31
|
|
800,001-1,000,000
|
241,400
- 301,750
|
2,160
|
651.78
|
1,440
|
434.52
|
|
1,000,001-3,000,000
|
301,750
- 905,250
|
4,320
|
1,303.56
|
2,880
|
869.04
|
|
3,000,001-5,000,000
|
905,251
- 1,508,751
|
8,800
|
2,655.40
|
5,400
|
1,629.45
|
|
5,000,001-7,000,000
|
1,508,751
- 2,112,251
|
9,200
|
2,776.10
|
6,000
|
1,810.50
|
|
More
than 7,000,001
|
>
2,112,251
|
9,600
|
2,896.80
|
6,600
|
1,991.55
|
|
| |
|
|
| |
|
| Monthly
Excess Charge |
|
|
Water
Usage
|
Excess
Charge
|
| Up
to 100m3 |
No
Charge |
| More
than 100m3 |
RM0.30
(9.05 US cents) per m3 |
| More
than 200m3 |
RM0.45
(13.58 US cents) per m3 |
| The
excess charges are subject to annual revision based on the water consumption
data for the previous year obtained from the Water Authority. |
| Source:
Indah Water Konsortium
Berhad |
|
| |
|
|
| |
|
|
| |
|
| >
Scheduled Waste
Treatment Rates |
|
| |
|
|
| |
|
Kualiti
Alam Sdn. Bhd. is the designated company providing scheduled waste treatment
services in Peninsular Malaysia. Its waste management centre is located
at Bukit Nanas in Negeri Sembilan. For industrial wastes other than those
mentioned below, collection and disposal rates vary according to location
and contractor. |
| |
|
|
| |
|
|
Waste
Group
|
Waste
Type |
|
A
|
Mineral
Oil Wastes
Waste containing lubricating oil, hydraulic oil, etc. |
|
B
|
Organic
Chemical Wastes Containing Halogen and/or Sulphur >1%
Freon, PVC wastes, chloroform, solvents, capacitors
and transformers containing PCB, etc. |
|
C
|
Wastes
Solvents Containing Halogen and/or Sulphur < 1%
Acetone, alcohols (eg. ethanol, methanol), benzene,
turpentine,
xylene, etc. Waste should be pumpable, containing <50%
water and 18MJ/kg calorofic value. |
|
H
|
Organic
Chemical Wastes Without Halogen and/or Sulphur <1%
Glue, latex, paint, phenol, printing ink, synthetic
oils, soap, epoxy, etc. |
|
K
|
Wastes
Containing Mercury
Mercury vapour lamps, COD-fluids, mercury batteries,
etc. |
|
T
|
Pesticide
Wastes
Insecticides, fungus and weed killers, rat poison,
etc |
|
X
|
Inorganic
Chemical Wastes
Acids, alkaline, sodium hypochlorite, inorganic salts,
metal hydroxide
sludge, chromate and cyanide waste, etc. |
|
Z
|
Miscellaneous
Medicine wastes, lab-packs, asbestos waste, mineral
sludge, isocyanates
(MDI,TDI), batteries, etc. |
|
| |
|
|
| |
|
Organic
Waste for Incineration |
| |
|
|
| |
|
|
Waste
Group
|
Packaged
Waste*
|
Bulk
Waste
|
|
Pumpable
liquid
|
Solid
|
Pumpable
liquid
|
Solid
|
|
per
tonne
|
per
tonne
|
|
RM
|
US$
|
RM
|
US$
|
RM
|
US$
|
RM
|
US$
|
|
A
|
810
|
244
|
-
|
-
|
630
|
190
|
-
|
-
|
|
B
|
3,150
|
951
|
3,600
|
1,086
|
-
|
-
|
-
|
-
|
|
C
|
1,350
|
407
|
-
|
-
|
-
|
-
|
-
|
-
|
|
H/Z
|
1,890
|
570
|
2,790
|
842
|
1,800
|
543
|
2,700
|
815
|
|
T
|
3,150
|
951
|
3,600
|
1,086
|
|
|
|
|
|
| |
|
|
| |
|
*Note:
Packaged waste refers to wastes packed in standard 200-litre drums or 1m3
PP Bags. |
| |
|
|
| |
|
Liquid
Inorganic Waste for Physical/Chemical Treatment |
| |
|
|
| |
|
|
Waste
Group
|
800-litre
Pallet Tank
per tonne
|
200-litre
Drum
per tonne
|
|
RM
|
US$
|
RM
|
US$
|
|
Acid
Waste without Chromate (X)
|
1,440
|
435
|
1,620
|
489
|
|
Alkaline
Waste without Cyanide (X)
|
1,440
|
435
|
1,620
|
489
|
|
Chromate
Waste (X)
|
1,800
|
543
|
1,980
|
597
|
|
Cyanide
Waste (X)
|
1,800
|
543
|
1,980
|
597
|
|
Mercury
Waste (K)
|
3,600
|
1,086
|
3,780
|
1,141
|
|
| |
|
|
| |
|
Inorganic
Waste for Solidification |
| |
|
|
| |
|
|
Waste
Group
|
Packaged
Waste*
per tonne
|
Waste
in Bulk
per tonne
|
|
RM
|
US$
|
RM
|
US$
|
|
X
/ Z
|
810
|
244
|
765
|
231
|
|
| |
|
|
| |
|
Inorganic
Waste for Direct Landfill |
| |
|
|
| |
|
|
Waste
Group
|
Packaged
Waste*
per tonne
|
Waste
in Bulk
per tonne
|
|
RM
|
US$
|
RM
|
US$
|
|
X
/ Z
|
495
|
149
|
450
|
136
|
|
| |
|
|
| |
|
Transportation
Rates |
| |
|
|
| |
|
|
KM
|
State |
Per
Pallet (RM)
|
Per
tonne
|
|
1st
Tier
|
2nd
Tier
|
|
min.
18 pallet
|
above
18 pallet
|
|
RM
|
US$
|
RM
|
US$
|
RM
|
US$
|
|
114
|
Negeri
Sembilan |
52.88
|
15.96
|
26.44
|
7.98
|
66.10
|
19.95
|
|
248
|
Kuala
Lumpur |
59.73
|
18.02
|
29.87
|
9.01
|
74.66
|
22.53
|
|
374
|
Selangor |
65.61
|
19.80
|
32.80
|
9.90
|
82.01
|
24.75
|
|
| |
|
Note:
For palletises pickup, the rates are in tier's, the 1st tier for minimum
pickup of 18 pallets and the 2nd tier is for any subsequent pallet pickup
from a single consignment CTI request. |
| |
|
Source:
Kualiti
Alam Sdn. Bhd. |
| |
|
Note
: USD1 = RM3.3140 |
| |
|
<